Menu Close

LAI's Six Sigma Team Cuts Production Time Twenty Percent

LAI International, Inc. (Scottsdale, AZ) has reduced production time by 20 percent for a critical structural aerospace component using a recently completed Six Sigma program.…

LAI International, Inc. (Scottsdale, AZ) has reduced production time by 20 percent for a critical structural aerospace component using a recently completed Six Sigma program.

A team of LAI employees in engineering, quality control and production formed a team to complete a comprehensive Six Sigma study that includes intensive workflow assessment, process analysis, value streaming and control planning of a manufacturing process for a precision-manufactured structural panel for a jet fighter.

"We also took every step off of our flowchart and measured the time to do each and every step of the process,? John Rogers, vice president of operations, said. ?The team examined key process input variables and studied methods to do each step more efficiently."

An evaluation seven months after the Six Sigma project was completed revealed savings of $196,000 in the program, related to a reduction in cycle times, more efficient inspections and an overall reduction in production time by 20 percent.

Six Sigma removes variation within a process, decreasing opportunities for defects. A Six Sigma process is defined as one with 3.4 defects per million opportunities.

The aerospace sub-assembly program involves supply chain management of multi-sequenced manufacturing processes, including material acquisition, precision grinding, heat-treating, advanced waterjet machining, hot forming, alpha-case removal, five-axis trimming, drilling, counter-sinking, hardware installation, painting, finishing and inspection.

www.LAIco.com

Subscribe to learn the latest in manufacturing.
Topics included the changing sales representative landscape, ways in which sales reps work with their principals and accounts, plus the impact of online purchasing and the importance of industry associations and educational initiatives.
Scotchman Industries continues to lead the way in U.S.-made metal fabrication solutions.
A milestone that blends history, innovation and energy efficiency: Salvagnini Maschinenbau’s 4,000th machine, a Generation 4 P4-3220, will equip CMAlifts’ new automated factory.
Precision, repeatability, and process optimization are essential across all sectors of modern manufacturing. Whether producing hardened steel drivetrain components, aerospace-grade titanium structures, or complex parts…
CERATIZIT OptiLine 5-flute end mill

Sign Up For e-Newsletter

eNewsletter Signup
Organized by SME
13 Apr
Mon, Apr 13, 2026 - 12:00 am
Thu, Apr 16, 2026 - 11:59 pm
415 Summer St., Boston, MA, United States, 02210
Organized by SME
14 Apr
Tue, Apr 14, 2026 - 12:00 am
Thu, Apr 16, 2026 - 11:59 pm
415 Summer St., Boston, MA, United States, 02210
Wed, Apr 22, 2026 - 12:00 am
Fri, Apr 24, 2026 - 11:59 pm
285 Andrew Young International Blvd NW, Atlanta, GA, United States, 30313
Sun, May 17, 2026 - 12:00 am
Thu, May 21, 2026 - 11:59 pm
601 Loyola Ave., New Orleans, LA, United States, 70113
Mon, Sep 14, 2026 - 12:00 am
Sat, Sep 19, 2026 - 11:59 pm
2301 S. Dr. Martin Luther King Jr. Drive, Chicago, IL, United States, 60616
Organized by SME
21 Oct
Wed, Oct 21, 2026 - 12:00 am
Fri, Oct 23, 2026 - 11:59 pm
3150 Paradise Road, Las Vegas, NV, United States, 89109
Tue, Nov 03, 2026 - 12:00 am
Fri, Nov 06, 2026 - 11:59 pm
3150 Paradise Road, Las Vegas, NV, United States, 89109
Organized by SME
11 May
Tue, May 11, 2027 - 12:00 am
Thu, May 13, 2027 - 11:59 pm
1305 Memorial Ave., West Springfield, Massachusetts, MA, United States